In Oxygen Not Included I have the problem that sometimes a high priority task will get blocked by a material delivery that is apparently less prioritized.
In other words, I want to build a building and it is set to maximum priority, but nevertheless dupes are doing other lower priority tasks and the reason for this is that the building is "awaiting a material delivery". I cannot see any way to prioritize the material delivery. What I want to do is prioritize the delivery the same as the building.