I've been noticing that as I progress through my game on Classic Ironman, the cost for me to manufacture satellites keeps going down. It was §100 when I started the game, at another point it was §78, and now it's down to §70.
What affects the cost of manufactured goods? Number of engineers? Workshops? Something else?