Commercial buildings (note - single shift versions exist and have half the jobs).
Total § §§ §§§ Tax@10%
§ LD (1x2) 14 10 4 0
§§ LD (2x2) 12 6 4 2
§§§ LD (2x2) 6 3 2 1
§ MD (1x4) 76 60 16 0 §110
§§ MD (4x4) 34 20 10 4
§§§ MD (4x4) 30 10 12 8
§ HD (2x4) 710 600 100 10 §260
§§ HD (4x4) 670 400 200 70
§§§ HD (4x4) 620 200 300 120
Industrial buildings
Total § §§ §§§ Tax@10%
T1 LD (2x4) 26 20 6 0 §80
T1 MD (4x4) 172 140 20 12 §320
T1 HD (8x4) 1620 1400 200 20 §800
T2 LD (2x4) 24 12 8 4 §90
T2 MD (4x4) 132 80 40 12 §370
T2 HD (8x4) 1330 800 400 130 §920
T3 LD (2x4) 22 4 10 8
T3 MD (4x4) 92 20 60 12
T3 HD (8x4) 940 200 600 140
Utilities
Garbage Dump 26 20 6 0
Large Fire Station 172 140 20 12
Police Precinct 76 60 16 0
Recycling Center 132 80 40 12
Water Pumping Station 132 80 40 12
Education
Community College 50 40 10 0
University 460 320 100 40
Metal Working
Smelting Factory 1620 1400 200 20
Trade Depot 26 20 6 0
Trade Port 56 40 12 4
Processor Factory 92 20 60 12
Consumer Electronics 1040 200 600 240
Power Plants
Coal Power Plant 26 20 6 0
Oil Power Plant 56 40 12 4
Reflecting Pool 7 5 2 0
Amphitheater 7 5 2 0
And, because I'm having so much fun bulldozing things... residential building values for workers, shoppers and students:
Workers Shoppers Students Tax@10%
§ LD (1x2) 4 2 2
§ MD (1x4) 40 20 15
§ MD (2x4) 40 20 15
§ HD (4x4) 400 200 100 §200
§§ LD (1x2) 2 1 2
§§ MD (4x4) 20 10 10
§§ HD (4x4) 200 100 50 §240
§§§ LD (4x2) 2 1 1
§§§ MD (4x4) 7 3 4
§§§ HD (4x4) 70 33 30 §280
Additional information
Modules do not have influence.